2019
Hauled at Shelter Island Shipyard, Richmond, BC
Installed hydraulic crane system including drum winches, sheaves, cables, and hydraulics
Installed new watermaker
Applied new bottom paint and Prop Speed
Installed new dive compressor
2020
Acquired and commissioned custom 32’ Icon center console
Designed and installed custom chocks for tender
Fitted lifting straps and completed crane testing
Installed UltraDeck flooring throughout tender
Added Gemlux rod holders and outriggers to center console
2021–2022
Major Structural Refit Begins
Removed interior flooring to access forward structural bulkheads
Removed systems throughout bilge areas
Removed original 1,600-gallon aluminum freshwater tank
Constructed new fiberglass freshwater tank integrated into the hull
Removed gray water tank
Replaced deteriorated bulkheads
Removed and replaced wiring and plumbing throughout vessel
Removed and rebuilt exterior hose pipes and railings
Extensive fiberglass reconstruction of bulkheads
Refinished bilges and interior structural spaces
2022–2023
Engine Room Rebuild
Completely stripped engine room
Removed hydraulic, fuel, plumbing, and electrical systems
Lifted both main engines for structural repairs
Removed old fiberglass engine beds and tabbing
Installed steel I-beams for engine support during reconstruction
Reinforced engine beds with extensive fiberglass laminates
Added additional stringers and structural supports
Removed original generator
Installed new John Deere 55kW generator
Installed new water pumps, plumbing, and bilge systems
Removed aft chock and bait tanks
Repaired teak cockpit decking
Repaired engine room fiberglass and reinstalled engines
Repaired aluminum superstructure
Repaired above-waterline through-hulls
Added insulation inside tender chock
Rebedded tender chock
Painted hull windows
2023–2024
Mechanical & Interior Upgrades
Installed new wiring from engine room to wheelhouse
Installed stateroom furniture and accommodations
Completely refinished interior woodwork
Fully painted engine room
Installed hydraulic systems
Installed entirely new steering system
Painted engines and oil tanks
Built new battery boxes
Rebuilt shore power and generator transfer systems
Removed aft aluminum freshwater tank and fiberglassed all four surrounding bulkheads
Installed new 500-gallon aluminum fuel day tank
Fiberglassed salon floor
Installed new Corian salon countertops
Fabricated new stainless-steel main engine exhaust systems
Rebuilt both main engine turbochargers
Refinished teak margin boards
Installed new helm chair
Refinished wheelhouse door teak
Installed new port-side John Deere generator with new exhaust
Reorganized mast wiring
Fiberglassed beneath bait tanks and installed new bait tanks
Built new engine start/stop control boxes
Installed new chest freezer
Installed new refrigerators and upright freezer
Installed all new electronics in wheelhouse and flybridge
Installed IsoBoost transformer in engine room
Installed new battery chargers
Installed all new toilets, blackwater system, and fiberglass holding tank
2024–2025
Completed new wiring for both main engines
Commissioned and started main engines
Relocated and installed watermakers
Completed MMC electrical boxes
April 2024: Vessel returned to service and autopilot calibrated
May–July 2024 Shipyard Period (Anacortes, Washington)
Complete yard records and invoices available.
Pressure washed and applied new bottom paint
Balanced propellers
Applied Prop Speed to propellers, shafts, and bow thruster
Installed all new zincs
Serviced and rebedded bow thruster
Pulled rudders and installed new seals
Ceramic-coated shaft bearing surfaces
Installed new Tides Marine shaft seals
Painted waterline
Painted bait tanks, flybridge, chocks, and aluminum house
Replaced every through-hull with TruDesign through-hulls
Removed old transducers and installed two new transducers
Removed stabilizer housings and rebuilt with solid fiberglass
Installed new stabilizer housings
Reinforced keel with additional fiberglass
Polished all windows and resealed window frames
Recertified life raft
New canvas throughout the vessel
2025–2026
Interior Refresh
Installed new carpet throughout
Refinished exterior brightwork
Installed 3M DI-NOC architectural finishes
Installed new bar stools
Installed new engine room ceiling panels
Numerous interior cosmetic upgrades and detailing
Completed full vessel survey
2026–Present
Installed new starter batteries
Upgraded Furuno network and display wiring
Continued ongoing system refinements and preventative maintenance