Complete Refit in 2003 (transformed from a patrol boat into a luxury yacht)
SUPERSTRUCTURE
- Additional superstructure in 2003.
- Triple planked Mahogany doubled with 5mm marine epoxy GRP
2007-2008
- Flybridge: installation of sunbathing area with sunbeds and a comfortable sitting area on the fly bridge.
- New RIB tender
WINTER 2008-2009
- Extensive refit
- New engines
- New generators
- New teak decks
WINTER 2009-2010
- Change of sun deck layout
- Extensive works in main saloon (new wall panels, new floor, new furniture...), galley, common areas, upholstery, and linen change in all cabins
WINTER 2010-2011
- Extensive refit in all staterooms and bathrooms
- New wall panels and ceilings
- Total bathroom transformation
2025:
General:
All bathroom mirrors
All interior headliners and paint
Exterior chairs
Interior and exterior upholstery (sofas, etc.)
Starlink installed
New carpets
New radar
Helm station finishes
Hull repainted
Superstructure repainted
Jet skis repainted
All varnish redone
New TV in the master cabin
Installation of Sonos sound system outdoors
Technical:
Engine and generator servicing
Cooling system completed (heat exchanger / intercooler, etc.)
Renovation of both onboard hydraulic pumps
Jet skis serviced
Tender serviced
Air conditioning serviced
Grey water / black water / wastewater pumps serviced
Naiad stabilizers upgraded with next-generation gyroscope